Know what to order before you call the yard.
Type your measurements and pick the paver. You get the order list the way the yard sells it: pallets plus loose layers, base gravel in tons for your soil, sand, edging and the dig. A Connecticut mason calls you to confirm before anything is ordered.
Free, no account. About two minutes.
How it works
Four steps. The last one is a phone call, on purpose.
Measure
Length and width, or the square footage. Feet and inches both work, and you can type it the way you say it: 12' 6".
Pick the paver
Nicolock, Cambridge, Belgard or Techo-Bloc. Pattern and waste follow the catalog for that product.
Get the list
Pallets and layers, base, sand, edging, joint sand, fabric, dig depth and delivery loads. Make the project report if you want it on paper.
We call you
Ask for the materials delivered or the job installed. A mason calls to confirm quantities and availability. Nothing is ordered until you say yes.
Pool deck? Start with the pool.
Most pool deck calculators have you guess an outer rectangle and subtract the water. This one asks the way a mason asks: how big is the pool, how wide is the walk around it, and where do you want it bigger for chairs or a table.
- The water is never counted as pavers
- Coping is its own line with its own piece count, mortar-set on the beam
- Curved pools get curve waste; ready-made radius coping gets none
- A plan drawing of your numbers, so you can check the shape
How the numbers are made
No black box. Every quantity on your list can be traced to a catalog page or a stated rule.
Coverage
Square feet per pallet and per layer come from the manufacturer catalog for the exact product and thickness.
Waste
A pattern rate (running bond is less than herringbone), a piece-size adjustment, more for curves and for narrow sections.
Base
Depth by use and soil: 5 to 6 in for patios on firm to average ground, 8 in for soft, 8 to 12 in for driveways. Gravel at 1.6 tons per loose yard with 20% compaction.
Edges
Only exposed edges get restraint and base overhang. An edge against the house or a pool does not.
Calculator vs. the real job
Jobs where the calculator list was checked against what was actually ordered and used.
| Job | Calculator said | Yard delivered | Left over |
|---|---|---|---|
| Patio, Shelton | |||
| Walkway, Trumbull |
Questions
Where do the quantities come from?
Coverage per pallet, layers per pallet, piece sizes and pattern rules come from the published Nicolock, Cambridge, Belgard and Techo-Bloc catalogs. Base depth follows Connecticut practice by soil and use. Waste is added by pattern, piece size, curves and narrow sections. The methodology page explains every step.
Is this an order or a quote?
No. It is a materials list with quantities only. If you ask for delivery or installation, a Connecticut mason calls you first to confirm quantities and availability. Nothing is ordered until you have said yes on that call.
Does it work for pool decks?
Yes. You enter the pool first, then the walkway width around it and any bigger areas. The water is never counted as pavers, and the coping is its own line with its own piece count.
What does it cost?
Nothing. The calculator, the results page and the project report need no account. You only leave contact details if you want someone to call you about the materials or the installation.