Connecticut hardscape materials

Know what to order before you call the yard.

Type your measurements and pick the paver. You get the order list the way the yard sells it: pallets plus loose layers, base gravel in tons for your soil, sand, edging and the dig. A Connecticut mason calls you to confirm before anything is ordered.

What are you building?

Free, no account. About two minutes.

What you get 16 x 20 ft patio, Nicolock Holland Stone, running bond
Pavers (7.1% cut waste included)2 pallets + 9 layers
3/4 in processed gravel base (6 in compacted)12.6 tons
Concrete sand bedding (1 in)1.5 tons
Geotextile fabric375 sq ft
Edge restraint72 lin ft
Polymeric sand5 bags
Dig depth (installer side)8.9 in
Soil out (spoil weight)11.8 tons
1Layers, not just pallets. Most Connecticut yards sell loose layers. The list says both, so you do not pay for a nearly empty pallet.
2Base sized to your soil. Firm, average or soft ground changes the depth, the tonnage and the dig.
3A supplier copy. One page with quantities only, to hand to any yard in the state.
Generated by the same engine, from the same catalog
Catalog data fromNicolock · Cambridge · Belgard · Techo-Bloc
Built bya Connecticut mason, Shelton CT
Before anything is orderedwe call you to confirm

How it works

Four steps. The last one is a phone call, on purpose.

1

Measure

Length and width, or the square footage. Feet and inches both work, and you can type it the way you say it: 12' 6".

2

Pick the paver

Nicolock, Cambridge, Belgard or Techo-Bloc. Pattern and waste follow the catalog for that product.

3

Get the list

Pallets and layers, base, sand, edging, joint sand, fabric, dig depth and delivery loads. Make the project report if you want it on paper.

4

We call you

Ask for the materials delivered or the job installed. A mason calls to confirm quantities and availability. Nothing is ordered until you say yes.

New

Pool deck? Start with the pool.

Most pool deck calculators have you guess an outer rectangle and subtract the water. This one asks the way a mason asks: how big is the pool, how wide is the walk around it, and where do you want it bigger for chairs or a table.

  • The water is never counted as pavers
  • Coping is its own line with its own piece count, mortar-set on the beam
  • Curved pools get curve waste; ready-made radius coping gets none
  • A plan drawing of your numbers, so you can check the shape
Plan view of a pool deck drawn from entered dimensions: pool, coping band, walkway and a larger area for chairs

How the numbers are made

No black box. Every quantity on your list can be traced to a catalog page or a stated rule.

Coverage

Square feet per pallet and per layer come from the manufacturer catalog for the exact product and thickness.

Waste

A pattern rate (running bond is less than herringbone), a piece-size adjustment, more for curves and for narrow sections.

Base

Depth by use and soil: 5 to 6 in for patios on firm to average ground, 8 in for soft, 8 to 12 in for driveways. Gravel at 1.6 tons per loose yard with 20% compaction.

Edges

Only exposed edges get restraint and base overhang. An edge against the house or a pool does not.

Read the full methodology, including what this tool does not do

Questions

Where do the quantities come from?

Coverage per pallet, layers per pallet, piece sizes and pattern rules come from the published Nicolock, Cambridge, Belgard and Techo-Bloc catalogs. Base depth follows Connecticut practice by soil and use. Waste is added by pattern, piece size, curves and narrow sections. The methodology page explains every step.

Is this an order or a quote?

No. It is a materials list with quantities only. If you ask for delivery or installation, a Connecticut mason calls you first to confirm quantities and availability. Nothing is ordered until you have said yes on that call.

Does it work for pool decks?

Yes. You enter the pool first, then the walkway width around it and any bigger areas. The water is never counted as pavers, and the coping is its own line with its own piece count.

What does it cost?

Nothing. The calculator, the results page and the project report need no account. You only leave contact details if you want someone to call you about the materials or the installation.

Your order list is about two minutes away.